<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>RenoInGR</title>
	<atom:link href="https://www.renoingr.gr/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.renoingr.gr</link>
	<description></description>
	<lastBuildDate>Thu, 08 Oct 2026 11:39:20 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://www.renoingr.gr/wp-content/uploads/2020/04/cropped-Untitled-4-01-32x32.png</url>
	<title>RenoInGR</title>
	<link>https://www.renoingr.gr</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Συγχρηματοδότηση του έργου RENOINGR, από το Πράσινο Ταμείο</title>
		<link>https://www.renoingr.gr/%cf%83%cf%85%ce%b3%cf%87%cf%81%ce%b7%ce%bc%ce%b1%cf%84%ce%bf%ce%b4%cf%8c%cf%84%ce%b7%cf%83%ce%b7-%cf%84%ce%bf%cf%85-%ce%ad%cf%81%ce%b3%ce%bf%cf%85-renoingr-%ce%b1%cf%80%cf%8c-%cf%84%ce%bf-%cf%80/</link>
		
		<dc:creator><![CDATA[Dimitra Petropoulou]]></dc:creator>
		<pubDate>Thu, 08 Oct 2026 11:32:31 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://www.renoingr.gr/?p=20495</guid>

					<description><![CDATA[Συγχρηματοδότηση εγκεκριμένων έργων στο πλαίσιο του ευρωπαϊκού προγράμματος LIFE, με συνολικό ποσό ύψους 1.184.990,19 ευρώ» στο πλαίσιο υλοποίησης του Χρηματοδοτικού Προγράμματος «ΕΥΡΩΠΑΙΚΑ ΠΡΟΓΡΑΜΜΑΤΑ 2026]]></description>
										<content:encoded><![CDATA[Συγχρηματοδότηση εγκεκριμένων έργων στο πλαίσιο του ευρωπαϊκού προγράμματος LIFE, με συνολικό ποσό ύψους 1.184.990,19 ευρώ» στο πλαίσιο υλοποίησης του Χρηματοδοτικού Προγράμματος «ΕΥΡΩΠΑΙΚΑ ΠΡΟΓΡΑΜΜΑΤΑ 2026]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Passive Fire Protection Measures for Building-Integrated Photovoltaic Systems</title>
		<link>https://www.renoingr.gr/pv-safety-en/</link>
		
		<dc:creator><![CDATA[Dimitra Petropoulou]]></dc:creator>
		<pubDate>Tue, 26 May 2026 09:20:48 +0000</pubDate>
				<category><![CDATA[Uncategorised]]></category>
		<guid isPermaLink="false">https://www.renoingr.gr/?p=20455</guid>

					<description><![CDATA[Abstract Passive fire protection of building-integrated photovoltaic (PV) systems is a critical parameter for their safe, resilient, and operationally efficient integration into the built environment. The increasing deployment of PV systems in both public and private buildings introduces new fire safety challenges, primarily due to direct current (DC) voltages, cabling, inverters, and energy storage systems.&#8230;]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="20455" class="elementor elementor-20455" data-elementor-post-type="post">
				<div class="elementor-element elementor-element-bbc865f e-flex e-con-boxed e-con e-parent" data-id="bbc865f" data-element_type="container" data-settings="{&quot;background_background&quot;:&quot;classic&quot;}">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-35a471d elementor-widget elementor-widget-heading" data-id="35a471d" data-element_type="widget" data-widget_type="heading.default">
				<div class="elementor-widget-container">
					<h4 class="elementor-heading-title elementor-size-default">Abstract</h4>				</div>
				</div>
				<div class="elementor-element elementor-element-267f738 elementor-widget-divider--view-line elementor-widget elementor-widget-divider" data-id="267f738" data-element_type="widget" data-widget_type="divider.default">
				<div class="elementor-widget-container">
							<div class="elementor-divider">
			<span class="elementor-divider-separator">
						</span>
		</div>
						</div>
				</div>
				<div class="elementor-element elementor-element-18b523e elementor-widget elementor-widget-text-editor" data-id="18b523e" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>Passive fire protection of building-integrated photovoltaic (PV) systems is a critical parameter for their safe, resilient, and operationally efficient integration into the built environment. The increasing deployment of PV systems in both public and private buildings introduces new fire safety challenges, primarily due to direct current (DC) voltages, cabling, inverters, and energy storage systems. The use of certified materials with high fire resistance, compartmentation, protection of cable penetrations, and the provision of access zones for firefighting operations significantly contribute to limiting fire ignition and spread.</p>
<p>At the same time, passive fire protection is directly linked to sustainability and the reduction of a building’s carbon footprint. Preserving the load-bearing structure and ensuring operational continuity reduces the need for repair or reconstruction, thereby minimizing the consumption of new materials, their transportation, and the required energy. In this way, building resilience is enhanced and its lifecycle is extended.</p>
<p><strong>Keywords:</strong> passive fire protection, photovoltaic systems, sustainability, carbon footprint, building resilience</p>								</div>
				</div>
					</div>
				</div>
		<div class="elementor-element elementor-element-b94468c e-flex e-con-boxed e-con e-parent" data-id="b94468c" data-element_type="container">
					<div class="e-con-inner">
		<div class="elementor-element elementor-element-a167e94 e-con-full e-flex e-con e-child" data-id="a167e94" data-element_type="container">
				<div class="elementor-element elementor-element-3127735 elementor-widget elementor-widget-image" data-id="3127735" data-element_type="widget" data-widget_type="image.default">
				<div class="elementor-widget-container">
															<img fetchpriority="high" decoding="async" width="603" height="804" src="https://www.renoingr.gr/wp-content/uploads/2026/04/Picture1.jpg" class="attachment-2048x2048 size-2048x2048 wp-image-20437" alt="" srcset="https://www.renoingr.gr/wp-content/uploads/2026/04/Picture1.jpg 603w, https://www.renoingr.gr/wp-content/uploads/2026/04/Picture1-225x300.jpg 225w, https://www.renoingr.gr/wp-content/uploads/2026/04/Picture1-9x12.jpg 9w" sizes="(max-width: 603px) 100vw, 603px" />															</div>
				</div>
				</div>
		<div class="elementor-element elementor-element-84e17c4 e-con-full e-flex e-con e-child" data-id="84e17c4" data-element_type="container">
				<div class="elementor-element elementor-element-90e8ca8 elementor-widget elementor-widget-text-editor" data-id="90e8ca8" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>On March 19–20, 2026, the <strong>4th International Conference of ELIPYKA 2026</strong>, titled <strong><em>“Fire Engineering and Contemporary Challenges in Fire Protection”</em></strong>, was held at the Athens Conservatoire. The conference served as a meeting point for industry, engineers, public authorities, and the scientific community.</p>
<p>As stated in the foreword by <strong>Prof. M. Founti</strong>, Emeritus Professor at the National Technical University of Athens, School of Mechanical Engineering, “<strong><em>for the first time in Greece, industry, engineers, public authorities, and the scientific community are brought together to collaborate meaningfully in a field of increasing technical and social importance</em></strong>.” </p>								</div>
				</div>
				</div>
					</div>
				</div>
		<div class="elementor-element elementor-element-c5bcbc2 e-flex e-con-boxed e-con e-parent" data-id="c5bcbc2" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-0f09fe4 elementor-widget elementor-widget-text-editor" data-id="0f09fe4" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>She further noted that <strong>“modern technological developments in the construction sector create new requirements and complex fire safety <em>challenges. Buildings are becoming increasingly complex, taller, and more energy efficient, while issues such as fire spread, material behavior at high temperatures, emission of toxic by-products, fire protection of energy installations, and the safety of high-rise buildings are now at the forefront of scientific and technical discussion.</em>”</strong></p>
<p>Fire protection constitutes a key component of sustainability, as it enhances energy and operational performance, ensures the continuous operation of infrastructure, and contributes to a more favorable environmental balance throughout the building lifecycle. Photovoltaic (PV) systems introduce an additional fire risk factor, mainly due to DC voltages, cabling, and inverters. Therefore, passive fire protection measures are critical for limiting fire spread and protecting the building envelope.</p>
<p>A comprehensive fire protection design, its proper implementation, and the appropriate selection of materials significantly reduce the likelihood of fire ignition and spread, while also extending the lifespan of installed systems and enhancing the overall resilience of the building stock. Particular importance is given to roof fire performance, which is assessed as a unified system, i.e., the combination of the PV installation with the configuration and materials of the roof. This parameter becomes even more critical in municipal and public buildings, such as educational and cultural facilities, where operational continuity and user safety are of paramount importance.</p>
<p>Regarding reaction to fire, the use of certified PV panels and mounting systems is recommended, along with cladding materials of high fire resistance class, such as A1 or A2 according to EN 13501-1. At the same time, combustible substrates, such as unprotected bituminous membranes, should be avoided, while non-combustible or low-flammability insulation materials and membranes are recommended. In particular, for flat roofs with thermal insulation, fire compartmentation is essential. This can be achieved by interrupting continuous PV arrays on large roofs, creating fire breaks, and aligning layouts with the building’s fire compartments.</p>
<p>PV panels should be installed at adequate distances from critical structural elements such as stairwell exits, skylights, ventilation ducts, and other service penetrations, while ensuring the required access zones for firefighting operations, in accordance with applicable regulations. Particular attention is required in large-scale installations, where the provision of access pathways, perimeter clearances, and fire compartmentation zones is crucial both for limiting horizontal fire spread and for ensuring safe and immediate emergency response.</p>
<p>Special emphasis should be placed on fire stopping at penetrations and in transformer areas, as well as on maintaining minimum required clearances. Cables should not run uncontrolled over fire-resistant separating elements; alternatively, they should be installed within fire-resistant conduits or shafts. Where PV cabling penetrates slabs, walls, or roofs, fire-resistant sealing materials and specialized collars/wraps must be used to maintain the required fire resistance rating (EI).</p>
<p>Equally important is the passive fire protection of cabling through:</p>
<ul>
<li>the use of low smoke zero halogen (LSZH) cables</li>
<li>installation on metal trays or conduits</li>
<li>avoidance of contact with combustible materials</li>
<li>appropriate protection when crossing fire compartments and floors</li>
</ul>
<p>Separate fire compartmentation is also required for electrical rooms, DC/AC inverters, and battery storage systems, using fire-resistant walls (e.g., EI 60), fire-rated doors, and avoiding installation along escape routes. In addition, adequate emergency lighting must be provided in accordance with applicable standards. Additional safety systems, such as properly located fire extinguishers, fault detectors, and arc fault detection devices, contribute to the immediate shutdown of inverters and electrical circuits. Similarly, automatic PV shutdown systems and spark detection further enhance overall fire safety.</p>
<p>It is evident that fire protection design can significantly influence the performance, resilience, and environmental responsibility of a building. It affects both the thermal and mechanical stress on the building envelope and the preservation of the load-bearing structure, while ensuring operational continuity.</p>
<p>Furthermore, it reduces the carbon footprint associated with the production and use of new repair materials, their transportation to the site, and the additional energy required in the event of repair or reconstruction.</p>
<p>In conclusion, fire protection is not merely a technical compliance requirement but a fundamental parameter of sustainable design. A building capable of withstanding extreme conditions, such as fire, maintains its functionality, extends the lifecycle of its infrastructure, and demonstrates a significantly lower environmental footprint over its lifecycle. In this sense, passive fire protection is directly linked to resilience, sustainability, and the long-term energy performance of the built environment.</p>								</div>
				</div>
				<div class="elementor-element elementor-element-96b6e12 elementor-widget elementor-widget-text-editor" data-id="96b6e12" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>The information is based on the presentations of:</p>
<p><strong>Mr. Dimitrios Petsas</strong>, Fire Officer, Member of the Preventive Fire Protection Department, Legal Support Directorate, Hellenic Fire Service Headquarters, Greece<br />Topic: <strong><em>“Fire Protection Measures and Systems for Power Generation Installations from Wind and Solar Energy and Energy Storage in</em></strong><strong><em> Lithium-Ion Battery Systems”</em></strong></p>
<p><strong>Ms. Aikaterini Arnaouti</strong>, Senior Sustainability Specialist, Noval Property, Mechanical &amp; Aeronautical Engineer, Greece<br />Topic: <strong><em>“Fire Protection as a Sustainability Factor: Performance, Resilience and Environmental Responsibility”</em></strong></p>								</div>
				</div>
				<div class="elementor-element elementor-element-6ee5533 elementor-widget elementor-widget-text-editor" data-id="6ee5533" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<div><b><strong>Sonia Sarkissian</strong> </b></div>
<div>
<p>Architect Engineer B.Eng. M.Eng. M.Sc.</p>
</div>								</div>
				</div>
					</div>
				</div>
				</div>
		]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Μέτρα Παθητικής Πυροπροστασίας Κτηριακών Εγκαταστάσεων Φωτοβολταϊκών Συστημάτων</title>
		<link>https://www.renoingr.gr/pv-safety/</link>
		
		<dc:creator><![CDATA[Dimitra Petropoulou]]></dc:creator>
		<pubDate>Mon, 20 Apr 2026 10:35:27 +0000</pubDate>
				<category><![CDATA[Uncategorised]]></category>
		<guid isPermaLink="false">https://www.renoingr.gr/?p=20434</guid>

					<description><![CDATA[Περίληψη Η παθητική πυροπροστασία των κτιριακών εγκαταστάσεων φωτοβολταϊκών (Φ/Β) συστημάτων αποτελεί κρίσιμη παράμετρο για την ασφαλή, ανθεκτική και λειτουργικά αποδοτική ενσωμάτωσή τους στο δομημένο περιβάλλον. Η αυξανόμενη εφαρμογή Φ/Β συστημάτων σε δημόσια και ιδιωτικά κτίρια δημιουργεί νέες προκλήσεις πυρασφάλειας, λόγω των τάσεων συνεχούς ρεύματος (DC), των καλωδιώσεων, των inverter και των συστημάτων αποθήκευσης ενέργειας. Η&#8230;]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="20434" class="elementor elementor-20434" data-elementor-post-type="post">
				<div class="elementor-element elementor-element-bbc865f e-flex e-con-boxed e-con e-parent" data-id="bbc865f" data-element_type="container" data-settings="{&quot;background_background&quot;:&quot;classic&quot;}">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-35a471d elementor-widget elementor-widget-heading" data-id="35a471d" data-element_type="widget" data-widget_type="heading.default">
				<div class="elementor-widget-container">
					<h4 class="elementor-heading-title elementor-size-default">Περίληψη</h4>				</div>
				</div>
				<div class="elementor-element elementor-element-267f738 elementor-widget-divider--view-line elementor-widget elementor-widget-divider" data-id="267f738" data-element_type="widget" data-widget_type="divider.default">
				<div class="elementor-widget-container">
							<div class="elementor-divider">
			<span class="elementor-divider-separator">
						</span>
		</div>
						</div>
				</div>
				<div class="elementor-element elementor-element-18b523e elementor-widget elementor-widget-text-editor" data-id="18b523e" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>Η παθητική πυροπροστασία των κτιριακών εγκαταστάσεων φωτοβολταϊκών (Φ/Β) συστημάτων αποτελεί κρίσιμη παράμετρο για την ασφαλή, ανθεκτική και λειτουργικά αποδοτική ενσωμάτωσή τους στο δομημένο περιβάλλον. Η αυξανόμενη εφαρμογή Φ/Β συστημάτων σε δημόσια και ιδιωτικά κτίρια δημιουργεί νέες προκλήσεις πυρασφάλειας, λόγω των τάσεων συνεχούς ρεύματος (DC), των καλωδιώσεων, των inverter και των συστημάτων αποθήκευσης ενέργειας. Η επιλογή πιστοποιημένων υλικών υψηλής πυραντίστασης, η πυροδιαμερισματοποίηση, η προστασία των διελεύσεων καλωδίων και η διασφάλιση ζωνών πρόσβασης για πυρόσβεση συμβάλλουν καθοριστικά στον περιορισμό της εκδήλωσης και εξάπλωσης πυρκαγιάς.</p><p>Παράλληλα, η παθητική πυροπροστασία συνδέεται άμεσα με τη βιωσιμότητα και τη μείωση του ανθρακικού αποτυπώματος του κτιρίου. Η διατήρηση της φέρουσας κατασκευής και της λειτουργικής συνέχειας περιορίζει τις ανάγκες αποκατάστασης ή ανακατασκευής, μειώνοντας την κατανάλωση νέων υλικών, τη μεταφορά τους και την απαιτούμενη ενέργεια. Με τον τρόπο αυτό ενισχύεται η ανθεκτικότητα του κτιρίου και επιμηκύνεται ο κύκλος ζωής του.</p><p><strong> </strong><strong>Λέξεις-κλειδιά: </strong>παθητική πυροπροστασία, φωτοβολταϊκά συστήματα, βιωσιμότητα, ανθρακικό αποτύπωμα, ανθεκτικότητα κτιρίων.</p>								</div>
				</div>
					</div>
				</div>
		<div class="elementor-element elementor-element-b94468c e-flex e-con-boxed e-con e-parent" data-id="b94468c" data-element_type="container">
					<div class="e-con-inner">
		<div class="elementor-element elementor-element-a167e94 e-con-full e-flex e-con e-child" data-id="a167e94" data-element_type="container">
				<div class="elementor-element elementor-element-3127735 elementor-widget elementor-widget-image" data-id="3127735" data-element_type="widget" data-widget_type="image.default">
				<div class="elementor-widget-container">
															<img fetchpriority="high" decoding="async" width="603" height="804" src="https://www.renoingr.gr/wp-content/uploads/2026/04/Picture1.jpg" class="attachment-2048x2048 size-2048x2048 wp-image-20437" alt="" srcset="https://www.renoingr.gr/wp-content/uploads/2026/04/Picture1.jpg 603w, https://www.renoingr.gr/wp-content/uploads/2026/04/Picture1-225x300.jpg 225w, https://www.renoingr.gr/wp-content/uploads/2026/04/Picture1-9x12.jpg 9w" sizes="(max-width: 603px) 100vw, 603px" />															</div>
				</div>
				</div>
		<div class="elementor-element elementor-element-84e17c4 e-con-full e-flex e-con e-child" data-id="84e17c4" data-element_type="container">
				<div class="elementor-element elementor-element-90e8ca8 elementor-widget elementor-widget-text-editor" data-id="90e8ca8" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>Στις 19 και 20 Μαρτίου 2026, στο Ωδείο Αθηνών, πραγματοποιήθηκε <strong>το 4ο Διεθνές Συνέδριο ΕΛ.Ι.ΠΥ.ΚΑ. 2026</strong>, με τίτλο <em>«<strong>Πυρομηχανική και Σύγχρονες Προκλήσεις στην Πυροπροστασία</strong>»</em>. Το συνέδριο αποτέλεσε «σημείο συνάντησης της βιομηχανίας, των μηχανικών, των θεσμικών φορέων της Πολιτείας και της επιστημονικής κοινότητας».‘Οπως προλογίζει η <strong>κ. Μ. Φούντη</strong>, Ομότιμη Καθηγήτρια του Εθνικού Μετσόβιου Πολυτεχνείου, Σχολή Μηχανολόγων Μηχανικών, «για πρώτη φορά στην Ελλάδα φέρνονται κοντά η βιομηχανία, οι μηχανικοί, οι φορείς της Πολιτείας και η επιστημονική κοινότητα, ώστε να συνεργαστούν ουσιαστικά σε ένα πεδίο με αυξανόμενη τεχνική και κοινωνική σημασία».</p>								</div>
				</div>
				</div>
					</div>
				</div>
		<div class="elementor-element elementor-element-c5bcbc2 e-flex e-con-boxed e-con e-parent" data-id="c5bcbc2" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-0f09fe4 elementor-widget elementor-widget-text-editor" data-id="0f09fe4" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>Η κ. Μ. Φούντη αναφέρθηκε στο γεγονός ότι «οι σύγχρονες τεχνολογικές εξελίξεις στον κατασκευαστικό τομέα δημιουργούν νέες απαιτήσεις και σύνθετες προκλήσεις πυρασφάλειας. Τα κτίρια γίνονται ολοένα πιο σύνθετα, υψηλότερα και ενεργειακά αποδοτικότερα, ενώ ζητήματα όπως η διάδοση της φωτιάς, η συμπεριφορά των υλικών σε υψηλές θερμοκρασίες, η έκλυση τοξικών παραπροϊόντων, η πυροπροστασία των ενεργειακών εγκαταστάσεων και η ασφάλεια των υψηλών κτιρίων βρίσκονται πλέον στο επίκεντρο της επιστημονικής και τεχνικής συζήτησης.» </p><p>Η πυροπροστασία αποτελεί βασικό στοιχείο της βιωσιμότητας, καθώς βελτιώνει την ενεργειακή και λειτουργική απόδοση, διασφαλίζει τη συνεχή λειτουργία των υποδομών και συμβάλλει σε ευνοϊκότερο περιβαλλοντικό ισοζύγιο καθ’ όλο τον κύκλο ζωής του κτιρίου.Τα φωτοβολταϊκά (Φ/Β) συστήματα εισάγουν έναν επιπλέον παράγοντα κινδύνου πυρκαγιάς, κυρίως λόγω των τάσεων συνεχούς ρεύματος (DC), των καλωδιώσεων και των inverter. Ως εκ τούτου, τα μέτρα παθητικής πυροπροστασίας είναι κρίσιμα για τον περιορισμό της εξάπλωσης της φωτιάς και την προστασία του κελύφους του κτιρίου.</p><p>Η ολοκληρωμένη μελέτη πυροπροστασίας, η ορθή εφαρμογή της και η κατάλληλη επιλογή υλικών περιορίζουν σημαντικά την πιθανότητα εκδήλωσης και εξάπλωσης πυρκαγιάς, ενώ παράλληλα παρατείνουν τον κύκλο ζωής των εγκατεστημένων συστημάτων και ενισχύουν τη συνολική ανθεκτικότητα του κτιριακού αποθέματος.Ιδιαίτερη σημασία έχει η πυροπροστασία της οροφής (roof fire performance), η οποία αξιολογείται ως ενιαίο σύνολο, δηλαδή ως συνδυασμός του φωτοβολταϊκού συστήματος με τη διαμόρφωση και τα υλικά της οροφής ή της στέγης. Η παράμετρος αυτή αποκτά ακόμη μεγαλύτερη βαρύτητα σε δημοτικά και δημόσια κτίρια, όπως κτίρια εκπαίδευσης και πολιτισμού, όπου η επιχειρησιακή συνέχεια και η προστασία των χρηστών είναι ύψιστης σημασίας.</p><p>Σε ό,τι αφορά την αντίδραση των υλικών στη φωτιά, συνιστάται η επιλογή πιστοποιημένων φωτοβολταϊκών πάνελ και συστημάτων στήριξης, καθώς και υλικών επένδυσης υψηλής κατηγορίας πυραντίστασης, όπως κατηγορίες A1 ή A2 σύμφωνα με το EN 13501-1. Παράλληλα, πρέπει να αποφεύγονται εύφλεκτα υποστρώματα, όπως ασφαλτικές μεμβράνες χωρίς προστασία, ενώ συστήνεται η χρήση μη καύσιμων ή χαμηλής αναφλεξιμότητας μονωτικών υλικών και μεμβρανών.Ιδιαίτερα στις επίπεδες στέγες με θερμομόνωση, είναι εξαιρετικά σημαντική η πυροδιαμερισματοποίηση. Αυτό επιτυγχάνεται με τη διακοπή της συνέχειας των συστοιχιών Φ/Β σε μεγάλα δώματα, τη δημιουργία ζωνών πυρασφάλειας (<em>fire breaks</em>) και την ευθυγράμμιση των διατάξεων με τα πυροδιαμερίσματα του κτιρίου.</p><p>Τα φωτοβολταϊκά πάνελ οφείλουν να τοποθετούνται σε επαρκή απόσταση από κρίσιμα δομικά στοιχεία, όπως απολήξεις κλιμακοστασίων, φεγγίτες, αεραγωγούς και λοιπές τεχνικές διελεύσεις, με παράλληλη διασφάλιση των απαιτούμενων ζωνών πρόσβασης για την επέμβαση των μέσων πυρόσβεσης, σύμφωνα με τις προβλέψεις του εκάστοτε ισχύοντος κανονιστικού πλαισίου. Ιδιαίτερη προσοχή απαιτείται σε εγκαταστάσεις μεγάλης επιφάνειας, όπου η πρόβλεψη κατάλληλων διαδρόμων πρόσβασης, περιμετρικών αποστάσεων και ζωνών πυροδιαμερισματοποίησης καθίσταται καθοριστικής σημασίας τόσο για τον περιορισμό της οριζόντιας εξάπλωσης της πυρκαγιάς όσο και για τη διασφάλιση της ασφαλούς και άμεσης επιχειρησιακής επέμβασης.</p><p>Ιδιαίτερη έμφαση πρέπει να δίνεται στις πυροφραγές στις διελεύσεις (penetrations) και στους χώρους μετασχηματιστών, καθώς και στην τήρηση των ελάχιστων απαιτούμενων αποστάσεων.</p><p>Τα καλώδια δεν θα πρέπει να διέρχονται ανεξέλεγκτα πάνω από πυράντοχα διαχωριστικά στοιχεία. Εναλλακτικά, απαιτείται η εγκατάστασή τους εντός πυράντοχων αγωγών ή φρεατίων.Όπου καλωδιώσεις Φ/Β διαπερνούν πλάκες, τοιχοποιίες ή στέγες, απαιτείται χρήση πυράντοχων σφραγιστικών υλικών και ειδικών <em>collars / wraps</em>, ώστε να διατηρείται ο απαιτούμενος δείκτης πυραντίστασης (EI).</p><p>Εξίσου σημαντική είναι η παθητική πυροπροστασία των καλωδιώσεων, μέσω:</p><ul><li>χρήσης καλωδίων χαμηλής εκπομπής καπνού και αλογόνων (LSZH)</li><li>τοποθέτησης σε μεταλλικούς δίσκους ή κανάλια</li><li>αποφυγής επαφής με εύφλεκτα υλικά</li><li>ειδικής προστασίας κατά τη διέλευση από πυροδιαμερίσματα και δάπεδα</li></ul><p>Προβλέπεται επίσης ξεχωριστή πυροδιαμερισματοποίηση για χώρους ηλεκτρολογικών πινάκων, inverter DC/AC και συσσωρευτών, με πυράντοχους τοίχους (π.χ. EI 60), πυράντοχες θύρες και αποφυγή εγκατάστασης σε οδεύσεις διαφυγής.Συμπληρωματικά, απαιτείται κατάλληλος και επαρκής φωτισμός ασφαλείας, σύμφωνα με τα ισχύοντα πρότυπα.Πρόσθετα συστήματα ασφαλείας, όπως πυροσβεστήρες σε κατάλληλα σημεία, ανιχνευτές σφαλμάτων και συσκευές έγκαιρης ανίχνευσης ηλεκτρικού τόξου (<em>arc fault detection</em>), συμβάλλουν στην άμεση απενεργοποίηση του inverter και του ηλεκτρικού κυκλώματος.Αντίστοιχα, συστήματα αυτόματης διακοπής της παροχής ενέργειας από τα Φ/Β πάνελ και ανίχνευσης σπινθήρων ενισχύουν σημαντικά το συνολικό επίπεδο πυρασφάλειας.</p><p>Είναι σαφές ότι ο σχεδιασμός πυροπροστασίας μπορεί να επηρεάσει ουσιαστικά την απόδοση, την ανθεκτικότητα και την περιβαλλοντική υπευθυνότητα ενός κτιρίου. Επηρεάζει τόσο τη θερμική και μηχανική καταπόνηση του κελύφους όσο και τη διατήρηση της φέρουσας κατασκευής, διασφαλίζοντας παράλληλα τη λειτουργική συνέχεια του κτιρίου.</p><p>Επιπροσθέτως, μειώνεται το ανθρακικό αποτύπωμα που θα προέκυπτε από την παραγωγή και χρήση νέων υλικών αποκατάστασης, από τη μεταφορά τους στο έργο, καθώς και από την πρόσθετη καταναλισκόμενη ενέργεια που θα απαιτούνταν σε περίπτωση επισκευής ή ανακατασκευής.</p><p>Καταληκτικά, η πυροπροστασία δεν αποτελεί μόνο τεχνική απαίτηση συμμόρφωσης, αλλά ουσιαστική παράμετρο βιώσιμου σχεδιασμού. Ένα κτίριο που μπορεί να αντέξει σε ακραίες συνθήκες, όπως η πυρκαγιά, διατηρεί τη λειτουργικότητά του, επιμηκύνει τον κύκλο ζωής των υποδομών και παρουσιάζει σαφώς μικρότερο περιβαλλοντικό αποτύπωμα σε ορίζοντα κύκλου ζωής. Με αυτή την έννοια, η παθητική πυροπροστασία συνδέεται άμεσα με την ανθεκτικότητα, τη βιωσιμότητα και τη μακροχρόνια ενεργειακή απόδοση του δομημένου περιβάλλοντος.</p>								</div>
				</div>
				<div class="elementor-element elementor-element-96b6e12 elementor-widget elementor-widget-text-editor" data-id="96b6e12" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>Οι πληροφορίες βασίζονται στις παρουσιάσεις των ομιλητών:</p><p><strong>κ. Πυραγός Πέτσας Χ. Δημήτριος</strong>, Στέλεχος του Τμήματος Προληπτικής Πυροπροστασίας της Διεύθυνσης Νομικής Υποστήριξης του <br />Αρχηγείου Π.Σ Ελλάδα με θέμα: «<strong>Μέτρα και Μέσα Πυροπροστασίας Εγκαταστάσεων Ηλεκτροπαραγωγής από Αιολική,<br />Ηλιακή Ενέργεια και Αποθήκευσής της σε Συστήματα Συσσωρευτών Ιόντων Λιθίου</strong>»</p><p><strong>κα Αικατερίνη Αρναούτη</strong>, SeniorSustainabilitySpecialist, NovalProperty, Μηχανολόγος | Αεροναυπηγός Μηχανικός, Ελλάδα, με θέμα:<br /><br />«<strong>Πυροπροστασία ως Παράγοντας Βιωσιμότητας: Απόδοση, Ανθεκτικότητα και Περιβαλλοντική Υπευθυνότητα</strong>»</p>								</div>
				</div>
				<div class="elementor-element elementor-element-6ee5533 elementor-widget elementor-widget-text-editor" data-id="6ee5533" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<div><b>Σόνια Σαρκισιάν </b></div><div><b>Αρχιτέκτων Μηχανικός B.Eng. M.Eng. M.Sc.</b></div>								</div>
				</div>
					</div>
				</div>
				</div>
		]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Call for Expression of Interest for Registration in the RenoInGR Project List of Interested Companies</title>
		<link>https://www.renoingr.gr/call_of_interest/</link>
		
		<dc:creator><![CDATA[Dimitra Petropoulou]]></dc:creator>
		<pubDate>Fri, 29 Aug 2025 19:22:48 +0000</pubDate>
				<category><![CDATA[Information]]></category>
		<guid isPermaLink="false">https://www.renoingr.gr/?p=20305</guid>

					<description><![CDATA[  The project RenoInGR – One-Stop-Shop to accelerate energy renovation of public buildings in Greek Municipalities is implemented under the LIFE Clean Energy Transition Programme and aims to support Greek municipalities in upgrading the energy performance of their public buildings. The project is coordinated by the National Technical University of Athens (NTUA) and is carried&#8230;]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="20305" class="elementor elementor-20305" data-elementor-post-type="post">
				<div class="elementor-element elementor-element-4578b63e e-flex e-con-boxed e-con e-parent" data-id="4578b63e" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-13117f5e elementor-widget elementor-widget-text-editor" data-id="13117f5e" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									
<p class="wp-block-paragraph"> </p>

<p class="wp-block-paragraph" data-start="65" data-end="612">The project <strong data-start="77" data-end="181">RenoInGR – One-Stop-Shop to accelerate energy renovation of public buildings in Greek Municipalities</strong> is implemented under the <strong data-start="207" data-end="249">LIFE Clean Energy Transition Programme</strong> and aims to support Greek municipalities in upgrading the energy performance of their public buildings. The project is coordinated by the <strong data-start="388" data-end="438">National Technical University of Athens (NTUA)</strong> and is carried out in collaboration with public and private stakeholders, including research institutions, technical consultants, municipalities, and regional authorities.</p>
<p data-start="614" data-end="1026">A central component of the project is the establishment and operation of the <strong data-start="691" data-end="714">One-Stop-Shop (OSS)</strong>, which provides technical, financial, and administrative support to municipalities for the preparation and implementation of energy renovation projects. The OSS operates physically through a Support Office, while a limited-scale digital support service is also being developed via a dedicated online platform.</p>

<p class="wp-block-paragraph">As part of the OSS operation, and in order to ensure transparency, efficiency, and the timely progress of procedures, it is deemed necessary to create a <strong data-start="1181" data-end="1216">List of Interested Stakeholders</strong>, which will include::</p>

<ul class="wp-block-list">
<li data-start="1240" data-end="1298">
<p data-start="1242" data-end="1298">engineering firms and providers of technical services,</p>
</li>
<li data-start="1299" data-end="1346">
<p data-start="1301" data-end="1346">contracting and construction companies, and</p>
</li>
<li data-start="1347" data-end="1421" data-is-last-node="">
<p data-start="1349" data-end="1421" data-is-last-node="">energy service companies (ESCOs) through energy performance contracts</p>
</li>
</ul>

<p class="wp-block-paragraph" data-start="82" data-end="380">This Call aims to invite expressions of interest from entities wishing to be included in the above-mentioned <strong data-start="191" data-end="226">List of Interested Stakeholders</strong> and to be eligible to participate in future tendering procedures for the provision of services related to the energy renovation of municipal buildings.</p>
<p data-start="382" data-end="543">Through this Call for Expressions of Interest, the RenoInGR project seeks to establish a <strong data-start="471" data-end="506">List of Interested Stakeholders</strong> covering the following categories:</p>

<h3 data-start="545" data-end="583">Technical / Engineering Services</h3>
<p class="wp-block-paragraph" data-start="584" data-end="767">This category includes providers with experience in building energy renovation studies targeting <strong data-start="681" data-end="699">zero emissions</strong> and <strong data-start="704" data-end="738">nearly zero energy consumption</strong>. The studies will involve:</p>
<ul data-start="768" data-end="982">
<li data-start="768" data-end="865">
<p data-start="770" data-end="865">conducting energy audits and issuing Energy Performance Certificates (EPCs), where not valid,</p>
</li>
<li data-start="866" data-end="913">
<p data-start="868" data-end="913">performing detailed energy inspections, and</p>
</li>
<li data-start="914" data-end="982">
<p data-start="916" data-end="982">preparing tender documents for the proposed technical solutions.</p>
</li>
</ul>
<p data-start="984" data-end="1194">Consultants, whether legal or natural persons, must demonstrate experience or secure sufficient capacity and expertise through partnerships, as defined in the respective calls, to meet the above requirements.</p>

<h3 data-start="1196" data-end="1220">Construction Works</h3>
<p class="wp-block-paragraph" data-start="1221" data-end="1362">This category addresses economic operators with the infrastructure and relevant experience to undertake energy renovation works, including:</p>
<ul data-start="1363" data-end="1620">
<li data-start="1363" data-end="1422">
<p data-start="1365" data-end="1422">improving the thermal insulation of building envelopes,</p>
</li>
<li data-start="1423" data-end="1493">
<p data-start="1425" data-end="1493">replacing windows, doors, and heating/cooling/ventilation systems,</p>
</li>
<li data-start="1494" data-end="1538">
<p data-start="1496" data-end="1538">installing renewable energy systems, and</p>
</li>
<li data-start="1539" data-end="1620">
<p data-start="1541" data-end="1620">installing and commissioning simple automation and energy management systems.</p>
</li>
</ul>
<p data-start="1622" data-end="1815">Economic operators must comply with the legal requirements to carry out the above works in public buildings or form partnerships with other legal or natural persons to meet such requirements.</p>

<h3 data-start="1817" data-end="1872">Energy Performance Services via Contracts (ESCOs)</h3>
<p class="wp-block-paragraph" data-start="1873" data-end="2137">This category targets companies operating under the <strong data-start="1925" data-end="1965">Energy Performance Contracting (EPC)</strong> model, i.e., companies that typically provide financing to design, implement, and operate energy-optimized solutions, with repayment through the achieved energy savings.</p>
<p data-start="2139" data-end="2294">This Call is open to individual providers or consortia holding the required licenses, certifications, or technical expertise. Specifically, it addresses:</p>
<ul data-start="2295" data-end="2519">
<li data-start="2295" data-end="2405">
<p data-start="2297" data-end="2405">legal entities under private law, such as companies providing technical, construction, or energy services,</p>
</li>
<li data-start="2406" data-end="2519">
<p data-start="2408" data-end="2519">natural persons with proven professional activity and sufficient technical competence in the relevant fields.</p>
</li>
</ul>
<p data-start="2521" data-end="2663">Interested stakeholders are invited to submit <strong data-start="2567" data-end="2604">documented evidence of experience</strong>, including references to relevant projects or contracts.</p>
<p data-start="2665" data-end="2781">Inclusion in the List is subject to compliance with the <strong data-start="2721" data-end="2743">selection criteria</strong> described in the following section.</p>
<p data-start="99" data-end="324">The <strong data-start="103" data-end="111">List</strong> to be established through this Call concerns entities capable of providing services within the framework of energy renovations of municipal buildings. Indicatively, the scope of the requested services includes:</p>
<ul data-start="326" data-end="1046">
<li data-start="326" data-end="626">
<p data-start="328" data-end="378"><strong data-start="328" data-end="366">Preparation of specialized studies</strong>, such as:</p>
<ul data-start="381" data-end="626">
<li data-start="381" data-end="507">
<p data-start="383" data-end="507">energy performance studies based on the principles of nearly zero-energy building (nZEB) design and zero-emission targets,</p>
</li>
<li data-start="510" data-end="626">
<p data-start="512" data-end="626">technical, structural, and electromechanical studies necessary for the maturation of energy renovation projects.</p>
</li>
</ul>
</li>
<li data-start="628" data-end="742">
<p data-start="630" data-end="742"><strong data-start="630" data-end="675">Implementation of technical interventions</strong> for the energy renovation of municipal building infrastructures.</p>
</li>
<li data-start="744" data-end="1046">
<p data-start="746" data-end="832"><strong data-start="746" data-end="818">Provision of energy services via Energy Performance Contracts (EPCs)</strong>, including:</p>
<ul data-start="835" data-end="1046">
<li data-start="835" data-end="923">
<p data-start="837" data-end="923">the study and implementation (or implementation only) of energy efficiency measures,</p>
</li>
<li data-start="926" data-end="968">
<p data-start="928" data-end="968">partial or full project financing, and</p>
</li>
<li data-start="971" data-end="1046">
<p data-start="973" data-end="1046">operational support of the measures throughout the duration of the EPC.</p>
</li>
</ul>
</li>
</ul>
<p data-start="1048" data-end="1297">The final scope and nature of the provided services will be further specified on a case-by-case basis, in accordance with the needs of the municipalities and the project calls to be issued by the One-Stop-Shop and/or the interested municipalities.</p>

<p class="wp-block-paragraph" data-start="1299" data-end="1416">Applicants wishing to be included in the Register will be evaluated on the basis of the following <strong data-start="1397" data-end="1413">key criteria</strong>:</p>
<ul data-start="1417" data-end="1920">
<li data-start="1417" data-end="1601">
<p data-start="1419" data-end="1601"><strong data-start="1419" data-end="1440">Proven experience</strong> in relevant projects, documented through participation in or undertaking of energy renovations, studies, or interventions related to the scope of the project.</p>
</li>
<li data-start="1602" data-end="1691">
<p data-start="1604" data-end="1691"><strong data-start="1604" data-end="1661">Capacity to operate across various geographical areas</strong> within the Greek territory.</p>
</li>
<li data-start="1692" data-end="1920">
<p data-start="1694" data-end="1920"><strong data-start="1694" data-end="1738">Certifications and professional licenses</strong> as required by the regulatory framework (e.g., Register of Engineering Firms, Register of Contractors, Technical Chamber of Greece, Energy Inspectors, Energy Auditors, ISO, etc.).</p>
</li>
</ul>
<p data-start="1922" data-end="2132">Compliance with the above criteria constitutes a fundamental prerequisite for inclusion in the List and potential participation in future selection procedures for service providers under the RenoInGR project.</p>

<p class="wp-block-paragraph" data-start="62" data-end="150">Interested entities may submit their application through one of the following methods:</p>
<p data-start="152" data-end="337"><strong data-start="152" data-end="185">a) Online Submission via Form</strong><br data-start="185" data-end="188" />By completing the electronic participation form available at the link:<br data-start="258" data-end="261" /><a class="decorated-link" href="https://forms.gle/wWrCzY2AGssfG8a86" target="_new" rel="noopener" data-start="261" data-end="335">https://forms.gle/wWrCzY2AGssfG8a86</a></p>
<p data-start="339" data-end="535"><strong data-start="339" data-end="366">b) Submission via Email</strong><br data-start="366" data-end="369" />By sending the required supporting documents to the email address: <strong data-start="436" data-end="462"><a class="decorated-link cursor-pointer" rel="noopener" data-start="438" data-end="460">renoingr.oss@gmail.com</a></strong><br data-start="462" data-end="465" />with the subject: <em data-start="483" data-end="533">“Application for the Providers’ List – RenoInGR”</em></p>

<h3 data-start="542" data-end="573">Required Submission Files</h3>
<p class="wp-block-paragraph" data-start="574" data-end="650">For participation to be considered valid, the following must be submitted:</p>
<ul data-start="651" data-end="925">
<li data-start="651" data-end="745">
<p data-start="653" data-end="745">Company profile or short curriculum vitae (CV), depending on the legal form of the entity.</p>
</li>
<li data-start="746" data-end="857">
<p data-start="748" data-end="857">Table of recent relevant projects or services provided, including a short description, year, and recipient.</p>
</li>
<li data-start="858" data-end="925">
<p data-start="860" data-end="925">Expression of Interest form (template provided in <strong data-start="910" data-end="921">Annex I</strong>).</p>
</li>
</ul>
<p data-start="927" data-end="1003">Submission may be made in Greek. All files must be sent in <strong data-start="986" data-end="1000">PDF format</strong>.</p>

<p class="wp-block-paragraph" data-start="1010" data-end="1285">Applications will be evaluated by the RenoInGR Project Team, based solely on the declared information and the submitted supporting documents.<br data-start="1151" data-end="1154" />Entities that meet the criteria will receive confirmation of their registration in the <strong data-start="1241" data-end="1272">List of Interested Entities</strong> via email.</p>
<p data-start="1287" data-end="1434">The List will be updated periodically and will remain dynamically open, with new Calls for Expressions of Interest launched at regular intervals.</p>
<p data-start="1436" data-end="1540">Registered entities will have the opportunity to participate in future calls for proposals concerning:</p>
<ul data-start="1541" data-end="1715">
<li data-start="1541" data-end="1582">
<p data-start="1543" data-end="1582">the preparation of technical studies,</p>
</li>
<li data-start="1583" data-end="1633">
<p data-start="1585" data-end="1633">the implementation of energy renovation works,</p>
</li>
<li data-start="1634" data-end="1715">
<p data-start="1636" data-end="1715">or the provision of services through <strong data-start="1673" data-end="1712">Energy Performance Contracts (EPCs)</strong>.</p>
</li>
</ul>
<p data-start="1717" data-end="1802">With new calls, registered entities may update the information they have submitted.</p>
<p data-start="1804" data-end="2011">The name and contact details of the entities registered in the List will be published and will be accessible on the website of the <strong data-start="1935" data-end="1952">One-Stop-Shop</strong>, for the purpose of informing interested municipalities.</p>
<p data-start="2013" data-end="2245">Inclusion in the List does not constitute a commitment of award or guarantee of participation in a project, but represents an indicative pre-selection stage for all related procedures to be carried out within the RenoInGR project.</p>

<h3 data-start="2252" data-end="2277">Contact Information</h3>
<p class="wp-block-paragraph" data-start="2278" data-end="2398">For more information or clarifications regarding this Call, interested entities may contact the RenoInGR Project Team:</p>
<ul data-start="2399" data-end="2666">
<li data-start="2399" data-end="2444">
<p data-start="2401" data-end="2444">Contact email: <strong data-start="2416" data-end="2442"><a class="decorated-link cursor-pointer" rel="noopener" data-start="2418" data-end="2440">renoingr.oss@gmail.com</a></strong></p>
</li>
<li data-start="2445" data-end="2506">
<p data-start="2447" data-end="2506">OSS telephone (weekdays 10:00–15:00): <strong data-start="2485" data-end="2504">+30 210 7723303</strong></p>
</li>
<li data-start="2507" data-end="2569">
<p data-start="2509" data-end="2569">Project website: <a class="decorated-link" href="http://www.renoingr.gr" target="_new" rel="noopener" data-start="2526" data-end="2567">www.renoingr.gr</a></p>
</li>
<li data-start="2570" data-end="2666">
<p data-start="2572" data-end="2666">Application form: <a class="decorated-link" href="https://forms.gle/wWrCzY2AGssfG8a86" target="_new" rel="noopener" data-start="2590" data-end="2664">https://forms.gle/wWrCzY2AGssfG8a86</a></p>
</li>
</ul>
<p data-start="2668" data-end="2804">Applicants are kindly requested to state the subject <em data-start="2721" data-end="2771">“Application for the Providers’ List – RenoInGR”</em> in all related correspondence.</p>
								</div>
				</div>
					</div>
				</div>
		<div class="elementor-element elementor-element-617af37 e-flex e-con-boxed e-con e-parent" data-id="617af37" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-78335c4 elementor-align-center e-transform elementor-widget elementor-widget-button" data-id="78335c4" data-element_type="widget" data-settings="{&quot;_transform_scale_effect_hover&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:1.1,&quot;sizes&quot;:[]},&quot;_transform_scale_effect_hover_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;_transform_scale_effect_hover_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}" data-widget_type="button.default">
				<div class="elementor-widget-container">
									<div class="elementor-button-wrapper">
					<a class="elementor-button elementor-button-link elementor-size-sm" href="https://www.renoingr.gr/wp-content/uploads/2025/08/Φόρμα-Εκδήλωσης-Ενδιαφέροντος.docx">
						<span class="elementor-button-content-wrapper">
									<span class="elementor-button-text">Expression of Interest Form</span>
					</span>
					</a>
				</div>
								</div>
				</div>
					</div>
				</div>
				</div>
		]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Invitation to Round Table Discussion</title>
		<link>https://www.renoingr.gr/4roundtable/</link>
		
		<dc:creator><![CDATA[AdminWordPress]]></dc:creator>
		<pubDate>Mon, 24 Feb 2025 16:38:32 +0000</pubDate>
				<category><![CDATA[Information]]></category>
		<guid isPermaLink="false">https://www.renoingr.gr/?p=20140</guid>

					<description><![CDATA[ONE-STOP-SHOP FOR THE ENERGY RENOVATION OF MUNICIPAL BUILDINGS Overcoming Challenges and Barriers in Project Initiation and Implementation Round Table Discussion 📅 05 March 2025🌐 Online Meeting 🔗 Connection link: https://us06web.zoom.us/j/81989309795 As part of the establishment of the One-Stop-Shop for accelerating energy renovations of municipal buildings, we invite you to an online Round Table Discussion focusing&#8230;]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="20140" class="elementor elementor-20140" data-elementor-post-type="post">
				<div class="elementor-element elementor-element-12443e e-flex e-con-boxed e-con e-parent" data-id="12443e" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-5be6e3ca elementor-widget elementor-widget-text-editor" data-id="5be6e3ca" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									
<h3 data-start="74" data-end="142">ONE-STOP-SHOP FOR THE ENERGY RENOVATION OF MUNICIPAL BUILDINGS</h3>
<p class="wp-block-paragraph" data-start="144" data-end="225"><strong data-start="144" data-end="223">Overcoming Challenges and Barriers in Project Initiation and Implementation</strong></p>
<p data-start="227" data-end="255"><strong data-start="227" data-end="253">Round Table Discussion</strong></p>
<p data-start="257" data-end="303"><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f4c5.png" alt="📅" class="wp-smiley" style="height: 1em; max-height: 1em;" /> <strong data-start="260" data-end="277">05 March 2025</strong><br data-start="277" data-end="280" /><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f310.png" alt="🌐" class="wp-smiley" style="height: 1em; max-height: 1em;" /> <strong data-start="283" data-end="301">Online Meeting</strong></p>
<p data-start="305" data-end="409"><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f517.png" alt="🔗" class="wp-smiley" style="height: 1em; max-height: 1em;" /> <strong data-start="308" data-end="328">Connection link:</strong> <a class="decorated-link" href="https://us06web.zoom.us/j/81989309795" target="_new" rel="noopener" data-start="329" data-end="407">https://us06web.zoom.us/j/81989309795</a></p>
<p data-start="411" data-end="707">As part of the establishment of the <strong data-start="447" data-end="464">One-Stop-Shop</strong> for accelerating energy renovations of municipal buildings, we invite you to an <strong data-start="545" data-end="578">online Round Table Discussion</strong> focusing on the difficulties faced by technical companies and energy service providers in the implementation of such projects.</p>
<p data-start="709" data-end="812">Three similar Round Table Discussions have already been held with local authorities (municipalities).</p>
<p data-start="814" data-end="934">Join the discussion, share your views, and contribute to shaping solutions for the acceleration of energy renovations.</p>

<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow" style="flex-basis: 100%;"> </div>
</div>

<h2 data-start="97" data-end="109">PROGRAM</h2>
<p class="wp-block-paragraph" data-start="111" data-end="141"><strong data-start="111" data-end="126">10:45–11:00</strong><br data-start="126" data-end="129" />Connection</p>
<p data-start="143" data-end="268"><strong data-start="143" data-end="158">11:00–11:05</strong><br data-start="158" data-end="161" />Opening and welcome by the Project Coordinator<br data-start="207" data-end="210" />Prof. Dionysis Assimakopoulos, NTUA (Professor Emeritus)</p>
<p data-start="270" data-end="503"><strong data-start="270" data-end="285">11:05–11:15</strong><br data-start="285" data-end="288" />The Regulatory Framework and the Efforts of the Ministry of Environment and Energy to Promote Energy Performance Contracting (EPCs)<br data-start="419" data-end="422" />Mr. G. Grigoriadis, Head of the ESCO Registry, Ministry of Environment &amp; Energy</p>
<p data-start="505" data-end="632"><strong data-start="505" data-end="520">11:15–11:25</strong><br data-start="520" data-end="523" />Welcome Address<br data-start="538" data-end="541" />Mr. Zacharias Athousakis, President of the Panhellenic Association of Technical Companies</p>
<p data-start="634" data-end="722"><strong data-start="634" data-end="649">11:25–11:35</strong><br data-start="649" data-end="652" />Welcome Address<br data-start="667" data-end="670" />Mr. I. Vougioukas, CEO, Cooperative Bank of Epirus</p>
<p data-start="724" data-end="934"><strong data-start="724" data-end="739">11:35–11:50</strong><br data-start="739" data-end="742" />The One-Stop-Shop (OSS) for accelerating energy renovations of municipal buildings – its establishment through the RenoInGR project<br data-start="873" data-end="876" />Prof. Dionysis Assimakopoulos, NTUA (Professor Emeritus)</p>
<p data-start="936" data-end="1064"><strong data-start="936" data-end="951">11:50–12:05</strong><br data-start="951" data-end="954" />Planned Services and the Operational Model of the OSS<br data-start="1007" data-end="1010" />E. Athanasakou, EUDITI Energy &amp; Environmental Design</p>
<p data-start="1066" data-end="1259"><strong data-start="1066" data-end="1081">12:05–12:20</strong><br data-start="1081" data-end="1084" />Utilizing Energy Performance Contracting (EPCs) within the OSS services – lessons from previous projects<br data-start="1188" data-end="1191" />A. Giakoumi, Centre for Renewable Energy Sources and Saving (CRES)</p>
<p data-start="1261" data-end="1389"><strong data-start="1261" data-end="1276">12:20–12:35</strong><br data-start="1276" data-end="1279" />The Financing Program of the Bank of Epirus for Energy Renovation Projects<br data-start="1353" data-end="1356" />S. Papadiamanti, Bank of Epirus</p>
<p data-start="1391" data-end="1416"><strong data-start="1391" data-end="1406">12:35–12:45</strong><br data-start="1406" data-end="1409" />Break</p>
<p data-start="1418" data-end="1558"><strong data-start="1418" data-end="1433">12:45–13:45</strong><br data-start="1433" data-end="1436" />Round Table Discussion – Participant Contributions<br data-start="1486" data-end="1489" />Moderator: Prof. Dionysis Assimakopoulos, NTUA (Professor Emeritus)</p>
<p data-start="1560" data-end="1577"><strong data-start="1560" data-end="1575">Key Issues:</strong></p>
<ul data-start="1578" data-end="2795">
<li data-start="1578" data-end="1855">
<p data-start="1580" data-end="1855">Main obstacles faced by companies in energy renovation projects:<br data-start="1644" data-end="1647" />• Bureaucratic and regulatory barriers<br data-start="1687" data-end="1690" />• Financing challenges<br data-start="1714" data-end="1717" />• Investment risks<br data-start="1737" data-end="1740" />• Technical and geographical difficulties in small, mountainous, and island municipalities<br data-start="1832" data-end="1835" />• Other barriers</p>
</li>
<li data-start="1857" data-end="2044">
<p data-start="1859" data-end="2044">Financial needs of companies for energy renovation projects:<br data-start="1919" data-end="1922" />• Which financial schemes and tools would facilitate project uptake and accelerate renovations in municipal buildings?</p>
</li>
<li data-start="2046" data-end="2240">
<p data-start="2048" data-end="2240">Differences in project implementation between small island/mountain municipalities and larger urban municipalities:<br data-start="2163" data-end="2166" />• Does bundling projects into larger groups make them more attractive?</p>
</li>
<li data-start="2242" data-end="2465">
<p data-start="2244" data-end="2465">Guarantees or safeguards that would make these projects more appealing to ESCOs and contractors:<br data-start="2340" data-end="2343" />• Possible changes in calls or contracting procedures to improve the participation of ESCOs and contracting companies.</p>
</li>
<li data-start="2467" data-end="2661">
<p data-start="2469" data-end="2661">How can the One-Stop-Shop reduce uncertainties for companies, beyond ensuring technical quality?<br data-start="2565" data-end="2568" />• Are there specific services or types of support that would be most useful to companies?</p>
</li>
<li data-start="2663" data-end="2795">
<p data-start="2665" data-end="2795">What would companies expect from the State or financial institutions to stimulate greater market activity in energy renovations?</p>
</li>
</ul>
<p data-start="2797" data-end="2872"><strong data-start="2797" data-end="2812">13:45–14:00</strong><br data-start="2812" data-end="2815" />Conclusions – Closing Session<br data-start="2844" data-end="2847" />NTUA – All Participants</p>
<hr data-start="2874" data-end="2877" />
<p> </p>

<p class="wp-block-paragraph"> </p>
								</div>
				</div>
					</div>
				</div>
				</div>
		]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Questionnaire</title>
		<link>https://www.renoingr.gr/%ce%b5%cf%81%cf%89%cf%84%ce%b7%ce%bc%ce%b1%cf%84%ce%bf%ce%bb%cf%8c%ce%b3%ce%b9%ce%bf/</link>
		
		<dc:creator><![CDATA[AdminWordPress]]></dc:creator>
		<pubDate>Mon, 17 Feb 2025 09:06:55 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://www.renoingr.gr/?p=20100</guid>

					<description><![CDATA[The Centre for Renewable Energy Sources and Saving (CRES), within the framework of the European project RenoInGR (Project 101167654 — LIFE23-CET), is conducting an online survey addressed to market stakeholders, regarding the establishment of a One-Stop-Shop (OSS) for the energy renovation of municipal buildings. Specifically, under the above programme, the coordinator, the National Technical University&#8230;]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="20100" class="elementor elementor-20100" data-elementor-post-type="post">
				<div class="elementor-element elementor-element-6e1d6d8c e-flex e-con-boxed e-con e-parent" data-id="6e1d6d8c" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-56b633ea elementor-widget elementor-widget-text-editor" data-id="56b633ea" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									
<p class="wp-block-paragraph" data-start="68" data-end="400">The <strong data-start="72" data-end="129">Centre for Renewable Energy Sources and Saving (CRES)</strong>, within the framework of the European project <strong data-start="176" data-end="221">RenoInGR (Project 101167654 — LIFE23-CET)</strong>, is conducting an <strong data-start="240" data-end="257">online survey</strong> addressed to market stakeholders, regarding the establishment of a <strong data-start="325" data-end="348">One-Stop-Shop (OSS)</strong> for the energy renovation of municipal buildings.</p>
<p data-start="402" data-end="797">Specifically, under the above programme, the coordinator, the <strong data-start="464" data-end="514">National Technical University of Athens (NTUA)</strong>, together with 13 other partners, has undertaken the creation of an entity in the form of a <strong data-start="607" data-end="630">One-Stop-Shop (OSS)</strong>, with the aim of assisting Local Authorities in accelerating the energy renovation of municipal buildings and directly benefiting from the European funds available.</p>
<p data-start="799" data-end="893">The services to be provided by the OSS to municipalities will vary depending on their needs.</p>
<p data-start="97" data-end="409">In small mountainous and island municipalities, the services of the <strong data-start="165" data-end="188">One-Stop-Shop (OSS)</strong> will include the full implementation of the project preparation process — from the feasibility study and the co-design of the financing plan, to the launch of the tender for the implementation of the energy renovation.</p>
<p data-start="411" data-end="826">In medium-sized and large municipalities, the services of the OSS will mainly focus on the provision of technical and financial consulting. An exception will be those municipalities that choose innovative financing solutions, such as energy performance contracts with guaranteed energy savings. In such cases, the OSS will provide full support throughout the project preparation process for the energy renovation.</p>
<p data-start="828" data-end="1054">This questionnaire is primarily addressed to market stakeholders, such as companies already active or wishing to become active in the field of energy services, construction companies, as well as any other interested parties.</p>
<p data-start="79" data-end="315">The purpose of this questionnaire is to explore the market’s perspective regarding the energy renovation of municipal buildings and to facilitate their preparation and financing, with the aim of accelerating their implementation rate.</p>
<p data-start="317" data-end="377">The questionnaire consists of the following five sections:</p>
<ol data-start="378" data-end="593">
<li data-start="378" data-end="434">
<p data-start="381" data-end="434">General information about your company/organization</p>
</li>
<li data-start="435" data-end="468">
<p data-start="438" data-end="468">Financing and implementation</p>
</li>
<li data-start="469" data-end="491">
<p data-start="472" data-end="491">Project tendering</p>
</li>
<li data-start="492" data-end="573">
<p data-start="495" data-end="573">Preliminary One-Stop-Shop services for the preparation of energy renovations</p>
</li>
<li data-start="574" data-end="593">
<p data-start="577" data-end="593">Other comments</p>
</li>
</ol>
<p data-start="595" data-end="774">You are kindly requested to complete the questionnaire either electronically or download it, fill it in, and send it to <strong data-start="715" data-end="750">CRES, attn. Ms. Argyro Giakoumi</strong> at <strong data-start="754" data-end="771"><a class="decorated-link cursor-pointer" rel="noopener" data-start="756" data-end="769">agiak@cres.gr</a></strong>.</p>
<p data-start="776" data-end="886">For clarifications regarding the completion of the questionnaire or for further information, please contact:</p>
<ul data-start="887" data-end="1021">
<li data-start="887" data-end="953">
<p data-start="889" data-end="953"><strong data-start="889" data-end="897">CRES</strong> – Ms. Argyro Giakoumi, +30 210 6603300, <a class="decorated-link cursor-pointer" rel="noopener" data-start="938" data-end="951">agiak@cres.gr</a></p>
</li>
<li data-start="954" data-end="1021">
<p data-start="956" data-end="1021"><strong data-start="956" data-end="966">EUDITI</strong> – Ms. Eva Athanasakou, +30 210 6446330, <a class="decorated-link cursor-pointer" rel="noopener" data-start="1007" data-end="1019">ea@euditi.gr</a></p>
</li>
</ul>
								</div>
				</div>
				<div class="elementor-element elementor-element-1a67215 elementor-widget elementor-widget-spacer" data-id="1a67215" data-element_type="widget" data-widget_type="spacer.default">
				<div class="elementor-widget-container">
							<div class="elementor-spacer">
			<div class="elementor-spacer-inner"></div>
		</div>
						</div>
				</div>
		<div class="elementor-element elementor-element-b45c3bb e-grid e-con-full e-con e-child" data-id="b45c3bb" data-element_type="container">
				<div class="elementor-element elementor-element-92c3c06 elementor-widget elementor-widget-button" data-id="92c3c06" data-element_type="widget" data-widget_type="button.default">
				<div class="elementor-widget-container">
									<div class="elementor-button-wrapper">
					<a class="elementor-button elementor-button-link elementor-size-sm" href="https://forms.gle/wpReLKpE2gpYrLRp9">
						<span class="elementor-button-content-wrapper">
									<span class="elementor-button-text">Online form</span>
					</span>
					</a>
				</div>
								</div>
				</div>
				<div class="elementor-element elementor-element-5fe954d elementor-widget elementor-widget-button" data-id="5fe954d" data-element_type="widget" data-widget_type="button.default">
				<div class="elementor-widget-container">
									<div class="elementor-button-wrapper">
					<a class="elementor-button elementor-button-link elementor-size-sm" href="https://www.renoingr.gr/wp-content/uploads/2025/02/Ερωτηματολόγιο-RenoInGR_Τεχνικές-εταιρείες-και-ΕΕΥ_τ.docx">
						<span class="elementor-button-content-wrapper">
									<span class="elementor-button-text">Download</span>
					</span>
					</a>
				</div>
								</div>
				</div>
				</div>
					</div>
				</div>
				</div>
		]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
